e-gem11-10010← Collection
images
Gemini 11 in preflight maintenance
- Reference
- e-gem11-10010
- Date
- 2007-11-12
The Gemini 11 spacecraft is lowered onto a dolly for preflight maintenance before stacking on the Titan rocket at the Kennedy Space Center. Dick Gordon and Pete Conrad would liftoff in this spacecraft on September 12, 1966 for a mission lasting almost three days. The crew practiced docking with the Agena unmanned docking craft, and Gordon also performed two spacewalks during the mission.
Contact →